China wholesale Pex Heating Manifold Suppliers - Brass Hpb57-3 4 Channel Underfloor Heating Manifold With Integrated Underfloor Heating Manifold With Auto Vent Valve – Peifeng

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With our loaded practical experience and thoughtful solutions, we now have been identified for a trusted provider for numerous intercontinental consumers for F1960 Fittings, Press Fitting Pipe, Pex F1960 Fittings, We are confident to make great achievements in the future. We are looking forward to becoming one of your most reliable suppliers.
China wholesale Pex Heating Manifold Suppliers - Brass Hpb57-3 4 Channel Underfloor Heating Manifold With Integrated Underfloor Heating Manifold With Auto Vent Valve – Peifeng Detail:

p1

Products Description

Floor heating  Manifolds installation:
1. Installation of floor heating water distributor: The water inlet and outlet of each loop heating pipe connected to the water inlet and outlet should be connected to the water distributor and the water collector respectively. The inner diameter of the water distributor and water collector should not be less than the inner diameter of the total supply and return pipes, and the maximum cross-sectional flow rate of the water distributor and water collector should not be greater than 0.8m/s. Each water distributor and water collector branch loop should not exceed 8 channels. Too many loops will lead to too dense piping at the sub-collector, which is not conducive to installation. A shut-off valve such as a copper ball valve shall be provided on the supply and return pipes of each branch loop.
2. Installation of floor heating water distributor: corresponding installation valve
On the water supply connection pipeline before the water distributor, valves, filters and drain pipes should be installed in the direction of water flow. Two valves are set before the water separator, mainly for cleaning the filter and closing when replacing or repairing the heat metering device; the filter is set to prevent impurities from clogging the flow meter and heating pipe. The valve and filter before the heat metering device can also be replaced by a filter ball valve. On the return water connection pipe after the water collector, a drain pipe should be installed, and a balance valve or other shut-off adjustment valve should be installed. System accessories should be made of corrosion-resistant materials. Install a drainage device for flushing pipes and drainage before acceptance and after maintenance. It is best to have drainage devices such as floor drains near the drainage device. For systems with heat metering requirements, a heat metering device shall be provided.
3. Bypass: between the main inlet pipe of the water distributor and the main outlet pipe of the water collector, a bypass pipe should be set up, and a valve should be set on the bypass pipe. The connection position of the bypass pipe should be between the beginning of the main water inlet pipe (before the valve) and the end of the main water outlet pipe (after the valve) to ensure that water does not flow into the heating pipe when flushing the heating pipeline system.
4. Installation of floor heating water separator: set manual or automatic exhaust valve.
Install an automatic air release valve as much as possible, so as to bring convenience to users in the future use process, and avoid the gas collection caused by factors such as cold and hot pressure difference and water replenishment, which hinders the operation of the system.

Essential Details

Floor Heating Valve: Anti-condensation Balance Valve
Material: Brass, Brass
Application: Apartment
Design Style: Modern
Brand Name: Peifeng
Type: Floor Heating Systems

Size: 1″x2-12WAYS
Packing: Carton
Color: Silver
Customized: Logo,Shape,Size
Support::

Supply Ability

Supply Ability: 1000000 Piece/Pieces per Month

Packaging & Delivery

Packaging Details: Inner box and carton box or color box or as client’s required
Port: NINGBO
Lead time:

Quantity(pieces) 1 - 3000 3001 - 5000 5001 - 10000 >10000
Est. time (days) 20 25 30 To be negotiated

Contact Us

bannernewsssss


Product detail pictures:

China wholesale Pex Heating Manifold Suppliers - Brass Hpb57-3 4 Channel Underfloor Heating Manifold With Integrated Underfloor Heating Manifold With Auto Vent Valve – Peifeng detail pictures


Related Product Guide:

With this motto in mind, we've got become among essentially the most technologically innovative, cost-efficient, and price-competitive manufacturers for China wholesale Pex Heating Manifold Suppliers - Brass Hpb57-3 4 Channel Underfloor Heating Manifold With Integrated Underfloor Heating Manifold With Auto Vent Valve – Peifeng , The product will supply to all over the world, such as: Colombia, Peru, Uruguay, Looking forward, we will keep pace with the times, continuing to create new products. With our strong research team, advanced production facilities, scientific management and top services, we will supply high quality products to our customers worldwide. We sincerely invite you to be our business partners for mutual benefits.
  • This supplier's raw material quality is stable and reliable, has always been in accordance with the requirements of our company to provide the goods that quality meet our requirements.
    5 Stars By Federico Michael Di Marco from US - 2018.03.03 13:09
    We have been appreciated the Chinese manufacturing, this time also did not let us disappoint,good job!
    5 Stars By Ella from Pakistan - 2017.12.02 14:11