China wholesale Oil Furnace Water Separator Suppliers - Spot Supply 2-12 Way Brass Water Manifold With Water Flow Meter For Floor Heating System Quantity Custom – Peifeng
China wholesale Oil Furnace Water Separator Suppliers - Spot Supply 2-12 Way Brass Water Manifold With Water Flow Meter For Floor Heating System Quantity Custom – Peifeng Detail:
Product Introduction
How to Drain the Heating Manifold
1. First find the installation position of the manifold. Generally, it is above the inlet pipe and below the outlet pipe.
2. In addition, the water in each manifold should be drained, so the general valve should be turned off first, and the water distribution pipe should remember to start releasing water from the left to the right. The small water valve above the first water distribution pipe does not move, and the second and fourth small water valves are twisted 90 degrees to the right respectively, and only the water in the first small water distribution pipe is released.
3. Next, connect the prepared plastic tube to the air outlet, and turn the small screw on the air outlet to the right to start the water release. The water just released is very turbid, and the temperature of the water is low. After placing a few basins, the water gradually becomes clear and the temperature gradually rises, which can be clearly felt by hand.
4. When the first water distribution pipe ends, the small water valve is closed, and the second water pipe is started to be put in, and the small water valve of the second water distribution pipe is twisted open, and the water is discharged in sequence until all.
5. After all is over, touch the water inlet pipe with your hand, the water temperature has risen significantly. At this time, open the main valve and all small water valves, and continue to discharge water until the temperature of the water outlet pipe is satisfactory.
Product Parameter
Material: Brass hpb57-3 |
Nominal pressure: ≤10bar |
Applicable price: hot and cold water |
Adjust the scale: 0-5 |
Working temperature: t≤70℃ |
Actuator connection thread: M30X1.5 |
Any connection branch pipe: 3/4″X?16 3/4″X?20 |
Connection thread: ISO 228 standard |
Branch pipe spacing: 50mm |
Number of roads: 2-12 roads |
Specification: 1″ 11/4″ |
Essential Details
Floor Heating Valve: Floor Heating System
Material: Brass, Brass
Application: Apartment :
Design Style: Modern
Brand Name: Peifeng
Type: Floor Heating Systems
Connection: male x female
Service: OEM,ODM or customized
Product name: 2 to 12 Loop Under Floor Heating Manifold Stainless
Technics: Forged
Supply Ability
Supply Ability: 1000000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details: Inner box and carton box or color box or as client’s required
Port: NINGBO
Lead time:
Quantity(pieces) | 1 - 3000 | 3001 - 5000 | 5001 - 10000 | >10000 |
Est. time (days) | 20 | 25 | 30 | To be negotiated |
Contact Us
Product detail pictures:
Related Product Guide:
We now have a skilled, performance team to supply good quality services for our consumer. We often follow the tenet of customer-oriented, details-focused for China wholesale Oil Furnace Water Separator Suppliers - Spot Supply 2-12 Way Brass Water Manifold With Water Flow Meter For Floor Heating System Quantity Custom – Peifeng , The product will supply to all over the world, such as: European, Ukraine, Switzerland, Thus far, our item associated with printer dtg a4 may be shown in most foreign nations as well as urban centers, which are sought after simply by targeted traffic. We all highly imagine that now we have now the full capacity to present you with contented merchandise. Desire to collect requests of your stuff and produce the long-term co-operation partnership. We very seriously promise:Csame top quality, better price; exact same selling price, higher quality.
By Fanny from Mexico - 2017.09.28 18:29
Wide range, good quality, reasonable prices and good service, advanced equipment, excellent talents and continuously strengthened technology forces,a nice business partner.
By Janice from Germany - 2017.12.02 14:11