China wholesale Central Heating Manifold Manufacturers - Brass Hpb57-3 4 Channel Underfloor Heating Manifold With Integrated Underfloor Heating Manifold With Auto Vent Valve – Peifeng

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We always do the job to be a tangible group making sure that we can provide you with the top top quality as well as ideal value for Hose Extension For Tap, Extension Nipple 15mm, Pex Manifold Fittings, We are anticipating to cooperate with you around the basis of mutual added benefits and common development. We are going to never disappoint you.
China wholesale Central Heating Manifold Manufacturers - Brass Hpb57-3 4 Channel Underfloor Heating Manifold With Integrated Underfloor Heating Manifold With Auto Vent Valve – Peifeng Detail:

p1

Products Description

Floor heating  Manifolds installation:
1. Installation of floor heating water distributor: The water inlet and outlet of each loop heating pipe connected to the water inlet and outlet should be connected to the water distributor and the water collector respectively. The inner diameter of the water distributor and water collector should not be less than the inner diameter of the total supply and return pipes, and the maximum cross-sectional flow rate of the water distributor and water collector should not be greater than 0.8m/s. Each water distributor and water collector branch loop should not exceed 8 channels. Too many loops will lead to too dense piping at the sub-collector, which is not conducive to installation. A shut-off valve such as a copper ball valve shall be provided on the supply and return pipes of each branch loop.
2. Installation of floor heating water distributor: corresponding installation valve
On the water supply connection pipeline before the water distributor, valves, filters and drain pipes should be installed in the direction of water flow. Two valves are set before the water separator, mainly for cleaning the filter and closing when replacing or repairing the heat metering device; the filter is set to prevent impurities from clogging the flow meter and heating pipe. The valve and filter before the heat metering device can also be replaced by a filter ball valve. On the return water connection pipe after the water collector, a drain pipe should be installed, and a balance valve or other shut-off adjustment valve should be installed. System accessories should be made of corrosion-resistant materials. Install a drainage device for flushing pipes and drainage before acceptance and after maintenance. It is best to have drainage devices such as floor drains near the drainage device. For systems with heat metering requirements, a heat metering device shall be provided.
3. Bypass: between the main inlet pipe of the water distributor and the main outlet pipe of the water collector, a bypass pipe should be set up, and a valve should be set on the bypass pipe. The connection position of the bypass pipe should be between the beginning of the main water inlet pipe (before the valve) and the end of the main water outlet pipe (after the valve) to ensure that water does not flow into the heating pipe when flushing the heating pipeline system.
4. Installation of floor heating water separator: set manual or automatic exhaust valve.
Install an automatic air release valve as much as possible, so as to bring convenience to users in the future use process, and avoid the gas collection caused by factors such as cold and hot pressure difference and water replenishment, which hinders the operation of the system.

Essential Details

Floor Heating Valve: Anti-condensation Balance Valve
Material: Brass, Brass
Application: Apartment
Design Style: Modern
Brand Name: Peifeng
Type: Floor Heating Systems

Size: 1″x2-12WAYS
Packing: Carton
Color: Silver
Customized: Logo,Shape,Size
Support::

Supply Ability

Supply Ability: 1000000 Piece/Pieces per Month

Packaging & Delivery

Packaging Details: Inner box and carton box or color box or as client’s required
Port: NINGBO
Lead time:

Quantity(pieces) 1 - 3000 3001 - 5000 5001 - 10000 >10000
Est. time (days) 20 25 30 To be negotiated

Contact Us

bannernewsssss


Product detail pictures:

China wholesale Central Heating Manifold Manufacturers - Brass Hpb57-3 4 Channel Underfloor Heating Manifold With Integrated Underfloor Heating Manifold With Auto Vent Valve – Peifeng detail pictures


Related Product Guide:

With reliable good quality system, great standing and perfect consumer support, the series of products and solutions produced by our organization are exported to quite a few countries and regions for China wholesale Central Heating Manifold Manufacturers - Brass Hpb57-3 4 Channel Underfloor Heating Manifold With Integrated Underfloor Heating Manifold With Auto Vent Valve – Peifeng , The product will supply to all over the world, such as: Holland, Las Vegas, Qatar, We insist on the principle of Credit being primary, Customers being the king and Quality being the best, we are looking forward to the mutual cooperation with all friends at home and abroad and we will create a bright future of business.
  • Although we are a small company, we are also respected. Reliable quality, sincere service and good credit, we are honored to be able to work with you!
    5 Stars By Austin Helman from Montpellier - 2018.09.12 17:18
    Company director has very rich management experience and strict attitude, sales staff are warm and cheerful, technical staff are professional and responsible,so we have no worry about product,a nice manufacturer.
    5 Stars By Claire from Chicago - 2017.11.29 11:09