China wholesale 4 Zone Boiler Manifold Suppliers - 2 To 13 Ports Stainless Steel Water Distribution Water Separator Flow Meter Underfloor Heating Radiant Water Manifolds – Peifeng

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Dedicated to strict high-quality management and considerate purchaser support, our experienced employees members are usually available to discuss your specifications and be certain full shopper satisfaction for Compression Coupling Copper Pipe, Hosepipe Extender, Crimped Plumbing Connections, We warmly welcome your participation according to mutual rewards during the around long term.
China wholesale 4 Zone Boiler Manifold Suppliers - 2 To 13 Ports Stainless Steel Water Distribution Water Separator Flow Meter Underfloor Heating Radiant Water Manifolds – Peifeng Detail:

p1

Product Description

Underfloor mixing valve Flow meter Stainless Steel Heating water Manifolds.
1. Stainless steel unibody construction.
2. Flexible, modular, and singular design system.
3. Fitting for both PEX and Multilayer Pipe.
4. Integrated flow-meters for precise flow control and balancing.
5. Return manifold equipped with shut-off valve and thermal actuator.
6. Easy, ready-to-assemble construction.
7. Equipped with automatic air vent and drain and bleeder valve.

Matters Needing Attention

Precautions for the use of floor heating  Manifolds:
1. When the floor heating water separator is used for the first time, it needs to inject hot water to start the geothermal heat. The specific steps are to open the main water supply loop valve of the water separator, and then gradually increase the temperature of the hot water to the pipeline and then circulate. Check the excuses of the water distributor for water leakage, and then gradually open the valves of each branch of the water distributor. If there is water leakage in the pipeline, please close the water supply valve in time, and notify the geothermal or the developer to come to deal with the problem.
2. The floor heating water separator controls the heating temperature of each room or their own area respectively. Users can adjust the temperature of each room according to their own needs. After the manual exhaust valve of the water separator is used, remember to remove the air in the floor heating water separator. Exhaust it cleanly, so as to ensure the heating temperature of each pipeline and the fluidity of water flow.
3. There is a filter in the front section of the water separator. When the user uses it for three or five months during the heating period every year, the filter should be cleaned once to ensure the cleanliness of the water pipe. After the heating is over, the filter should be cleaned with clean water. Rinse well.
4. There is a process for heating. Generally speaking, the temperature cannot be felt immediately after turning on the floor heating. Under normal circumstances, the temperature can reach the preset effect after two to six days, but pay attention, the water temperature of the floor heating should not exceed 65 degrees Celsius.
5. If you are not at home for a long time, or you do not use the floor heating water separator for a long time, it is recommended to reduce the total valve of the floor heating water separator before going out, but do not close it completely. If it is determined that it will not be used for a long time, then turn off the floor heating Be sure to blow dry the water pipe before closing it.

Essential Details

Floor Heating Valve: Floor Heating Systems
Material: Other
Application: Hotel
Design Style: Modern
Brand Name: Peifeng

Type: Floor Heating Systems, Floor Heating Parts
Usage: Underfloor Heating Controls System
Function: Thermostatic Mixing Valve
Feature: Flexible
Size: 1inch

Packaging & Delivery

Selling Units: Single item
Single package size: 20X20X20 cm
Single gross weight: 2.000 kg
Package Type: Carton Package
Lead time:

Quantity(pieces) 1 - 1000 >1000
Est. time (days) 15 To be negotiated

Contact Us

bannernewsssss


Product detail pictures:

China wholesale 4 Zone Boiler Manifold Suppliers - 2 To 13 Ports Stainless Steel Water Distribution Water Separator Flow Meter Underfloor Heating Radiant Water Manifolds – Peifeng detail pictures

China wholesale 4 Zone Boiler Manifold Suppliers - 2 To 13 Ports Stainless Steel Water Distribution Water Separator Flow Meter Underfloor Heating Radiant Water Manifolds – Peifeng detail pictures

China wholesale 4 Zone Boiler Manifold Suppliers - 2 To 13 Ports Stainless Steel Water Distribution Water Separator Flow Meter Underfloor Heating Radiant Water Manifolds – Peifeng detail pictures


Related Product Guide:

We're convinced that with joint endeavours, the business between us will bring us mutual benefits. We are able to guarantee you products high quality and competitive value for China wholesale 4 Zone Boiler Manifold Suppliers - 2 To 13 Ports Stainless Steel Water Distribution Water Separator Flow Meter Underfloor Heating Radiant Water Manifolds – Peifeng , The product will supply to all over the world, such as: Kyrgyzstan, Algeria, Slovakia, Being guided by customer demands, aiming at improving the efficiency and quality of customer service, we constantly improve products and provide more comprehensive services. We sincerely welcome friends to negotiate business and start cooperation with us. We hope to join hands with friends in different industries to create a brilliant future.
  • The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.
    5 Stars By Jocelyn from Munich - 2018.05.22 12:13
    We are really happy to find such a manufacturer that ensuring product quality at the same time the price is very cheap.
    5 Stars By Irene from Nigeria - 2017.08.16 13:39