China wholesale 4 Loop Pex Manifold Manufacturers - Spot Supply 2-12 Way Brass Water Manifold With Water Flow Meter For Floor Heating System Quantity Custom – Peifeng

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Sincerity, Innovation, Rigorousness, and Efficiency would be the persistent conception of our corporation to the long-term to establish collectively with customers for mutual reciprocity and mutual benefit for Shower Faucet With Temperature Control, Hose Pipe Extension Adapter, Brass Elbow Compression Fittings, The mission of our firm should be to provide the best high quality goods with finest price tag. We've been on the lookout forward to doing organization with you!
China wholesale 4 Loop Pex Manifold Manufacturers - Spot Supply 2-12 Way Brass Water Manifold With Water Flow Meter For Floor Heating System Quantity Custom – Peifeng Detail:

p1

Product Introduction

How to Drain the Heating Manifold
1. First find the installation position of the manifold. Generally, it is above the inlet pipe and below the outlet pipe.
2. In addition, the water in each manifold should be drained, so the general valve should be turned off first, and the water distribution pipe should remember to start releasing water from the left to the right. The small water valve above the first water distribution pipe does not move, and the second and fourth small water valves are twisted 90 degrees to the right respectively, and only the water in the first small water distribution pipe is released.
3. Next, connect the prepared plastic tube to the air outlet, and turn the small screw on the air outlet to the right to start the water release. The water just released is very turbid, and the temperature of the water is low. After placing a few basins, the water gradually becomes clear and the temperature gradually rises, which can be clearly felt by hand.
4. When the first water distribution pipe ends, the small water valve is closed, and the second water pipe is started to be put in, and the small water valve of the second water distribution pipe is twisted open, and the water is discharged in sequence until all.
5. After all is over, touch the water inlet pipe with your hand, the water temperature has risen significantly. At this time, open the main valve and all small water valves, and continue to discharge water until the temperature of the water outlet pipe is satisfactory.

Product Parameter

2

Material: Brass hpb57-3
Nominal pressure: ≤10bar
Applicable price: hot and cold water
Adjust the scale: 0-5
Working temperature: t≤70℃
Actuator connection thread: M30X1.5
Any connection branch pipe: 3/4″X?16 3/4″X?20
Connection thread: ISO 228 standard
Branch pipe spacing: 50mm
Number of roads: 2-12 roads
Specification: 1″ 11/4″

Essential Details

Floor Heating Valve: Floor Heating System
Material: Brass, Brass
Application: Apartment :
Design Style: Modern
Brand Name: Peifeng

Type: Floor Heating Systems
Connection: male x female
Service: OEM,ODM or customized
Product name: 2 to 12 Loop Under Floor Heating Manifold Stainless
Technics: Forged

Supply Ability

Supply Ability: 1000000 Piece/Pieces per Month

Packaging & Delivery

Packaging Details: Inner box and carton box or color box or as client’s required
Port: NINGBO
Lead time:

Quantity(pieces) 1 - 3000 3001 - 5000 5001 - 10000 >10000
Est. time (days) 20 25 30 To be negotiated

Contact Us

bannernewsssss


Product detail pictures:

China wholesale 4 Loop Pex Manifold Manufacturers - Spot Supply 2-12 Way Brass Water Manifold With Water Flow Meter For Floor Heating System Quantity Custom – Peifeng detail pictures

China wholesale 4 Loop Pex Manifold Manufacturers - Spot Supply 2-12 Way Brass Water Manifold With Water Flow Meter For Floor Heating System Quantity Custom – Peifeng detail pictures


Related Product Guide:

Our mission is usually to turn into an innovative provider of high-tech digital and communication devices by providing worth added design and style, world-class producing, and repair capabilities for China wholesale 4 Loop Pex Manifold Manufacturers - Spot Supply 2-12 Way Brass Water Manifold With Water Flow Meter For Floor Heating System Quantity Custom – Peifeng , The product will supply to all over the world, such as: Cyprus, Kenya, Serbia, Our professional engineering group will always be ready to serve you for consultation and feedback. We are able to also offer you with absolutely free samples to meet your requirements. Finest efforts will likely be produced to give you the ideal service and goods. For anyone who is thinking about our company and merchandise, please contact us by sending us emails or contact us quickly. As a way to know our merchandise and firm. lot more, you can come to our factory to find out it. We'll always welcome guests from all over the world to our business to build company relations with us. Please feel free to get in touch with us for business and we believe we are going to share the top trading practical experience with all our merchants.
  • Product variety is complete, good quality and inexpensive, the delivery is fast and transport is security, very good, we are happy to cooperate with a reputable company!
    5 Stars By Rosemary from Roman - 2018.10.09 19:07
    Wide range, good quality, reasonable prices and good service, advanced equipment, excellent talents and continuously strengthened technology forces,a nice business partner.
    5 Stars By Beatrice from Peru - 2018.11.11 19:52